{"id":3017,"date":"2020-01-23T20:51:40","date_gmt":"2020-01-23T20:51:40","guid":{"rendered":"http:\/\/cascademagazines.com\/?p=3017"},"modified":"2026-01-22T20:37:54","modified_gmt":"2026-01-22T20:37:54","slug":"https-lordofthelakes-net-wp-content-uploads-2020-01-february-2020-pdf","status":"publish","type":"post","link":"https:\/\/cascademagazines.com\/index.php\/2020\/01\/23\/https-lordofthelakes-net-wp-content-uploads-2020-01-february-2020-pdf\/","title":{"rendered":"January 2020 Bldg &#038; Grounds Minutes"},"content":{"rendered":"<div class=\"et_pb_section_0 et_pb_section et_section_regular et_block_section\"><div class=\"et_pb_row_0 et_pb_row et_block_row\"><div class=\"et_pb_column_0 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_0 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><p><strong>Lord of the Lakes Church<\/strong><\/p>\n<p><strong>Buildings &amp; Grounds Meeting Minutes <\/strong><\/p>\n<p><strong>Tuesday, January 14, 2020<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>Kate Pfandtner opened meeting with Prayer at 6:33 P.M.\u00a0 The following were present: Kate Pfaendtner, Warren Winter, Daryl Ramlow, Rick Pierre, Lou Zwicky, Dave Smolinski, Ben Manning, &amp; Betts Nikolai.\u00a0\u00a0 Agendas were handed out.<\/p>\n<p><strong><u>General Monthly Maintenance:<\/u><\/strong><\/p>\n<ul>\n<li>Brad unable to attend meeting so no update on Monthly Maintenance.<\/li>\n<\/ul>\n<p><strong><u>\u00a0<\/u><\/strong><\/p>\n<p><strong><u>Painting:<\/u><\/strong><\/p>\n<ul>\n<li>Hallway has been completed. Thank You Ray Zegers.<\/li>\n<li>It was brought to the attention of the Team that the Kitchen desperately needs painting. Brad will handle this\u2026 check with him on timing.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong><u>Old Business:<\/u><\/strong><strong>\u00a0\u00a0 <\/strong><\/p>\n<ol>\n<li><strong>Back Door:<\/strong> New Back door installed by Albright.\u00a0 Pastor Kevin noticed was leaking and talked with Tom Z about it.\u00a0\u00a0 Tom did get in touch with Brad and this was addressed.\u00a0 Door does need to be painted, and this will be completed by Ray Z. \/ Brad.<\/li>\n<\/ol>\n<p>Brad will take care of repairing the wall in the area by the door.<\/p>\n<ol start=\"2\">\n<li><strong>Coffee Maker:<\/strong> Several comments, some positive, some negative.\u00a0 Line gets to long with food by the kitchen window.\u00a0 Suggested that we move food on counter where the coffee is.\u00a0<\/li>\n<li><strong>Carpet Cleaner:<\/strong> No new update from Betts\/ John.\u00a0\u00a0 Betts did check out online on the dry carpet cleaner.\u00a0 We have a Host machine and not able to get the dry cleaning material that goes with the machine.\u00a0 There is another product called Capture\u2026wondered if we could possible use that with the machine.<\/li>\n<li><strong>Sancturay Ceiling:<\/strong> Kate has been trying to get in touch with a Acoustic Painting Specialist.\u00a0 Has attempted to make contact with Miron Construction.\u00a0 Ben Manning suggested contacting the Grand,\u00a0 &amp; PAC to see if they could give any imput\/recommendations.<\/li>\n<li><strong>Electrical System Update:<\/strong> Per Daryl R.\u00a0 many issues.\u00a0 All from the time the building was constructed.\u00a0 No one to go back on.\u00a0 <strong>ALL LED LIGHTS WERE COMPLETED 2019.<\/strong><\/li>\n<li><strong>Fiber Optic Cable <\/strong>(Request by Pastor Kevin)\u00a0 Need to check with Neil B. on Blue Tooth option.<\/li>\n<li><strong>Quotes for deferred Maintenance &amp; Replacement: <\/strong><\/li>\n<\/ol>\n<ul>\n<li><strong>HVAC (furnace replacement) <\/strong>Brad<\/li>\n<li><strong>Electrical <\/strong>Daryl<\/li>\n<li><strong>Addition or Basement Remodel <\/strong>Kate<\/li>\n<\/ul>\n<p>Ben Manning Joined our meeting to give the Team some information on Egress Window if we would do basement remodel.\u00a0 It was then brought up if using the basement was the route we decided to proceed with, would we need an elevator.\u00a0 It was decided we need to get that information before we could make a decision on remodel, stick building, pre-fab.\u00a0<\/p>\n<p>&nbsp;<\/p>\n<p><strong><u>New Business:<\/u><\/strong><\/p>\n<ul>\n<li><strong>New Railings: <\/strong>It was brought to the attention of our Team that we should look into having some railings installed on the steps leading up to the altar. (Safety Issue) \u00a0This would be to aid people who are doing the readings &amp; serving communion.\u00a0 The team agreed unanimously that railing should be installed off to the side.\u00a0 Recommendation will be sent to Council.\u00a0\u00a0 <strong>NOTE: <\/strong>\u00a0Per Daryl we will need to anchor into concrete and <strong>before<\/strong> drilling we need to locate conduit.<\/li>\n<li><strong>Sound System:<u> <\/u><\/strong>The sound system is failing.\u00a0\u00a0 Met with Vendor on Friday, 01\/10\/20.<\/li>\n<\/ul>\n<p>They will be getting back to us with recommendations.<\/p>\n<ul>\n<li><strong>Spring Cleaning: <\/strong>Possible dates:\u00a0\u00a0 Sunday April 26th or Sunday May 3<sup>rd<\/sup>. Need to check Church Calendar to make sure the Church is not\u00a0 being used.\u00a0\u00a0 It would take place after 2<sup>nd<\/sup>\u00a0<\/li>\n<\/ul>\n<p><strong>Meeting Adjourned 7:36 PM<\/strong><\/p>\n<p><strong><u>\u00a0<\/u><\/strong><\/p>\n<p><strong><u>Next B &amp; G Meeting is Tuesday, \u00a0February 11, 2020 @ 6:30 P.M.<\/u><\/strong><\/p>\n<p>Meeting Minutes respectively submitted by Betts Nikola<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-3017","post","type-post","status-publish","format-standard","hentry","category-building-and-grounds-minutes"],"_links":{"self":[{"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/posts\/3017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/comments?post=3017"}],"version-history":[{"count":1,"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/posts\/3017\/revisions"}],"predecessor-version":[{"id":6676,"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/posts\/3017\/revisions\/6676"}],"wp:attachment":[{"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/media?parent=3017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/categories?post=3017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cascademagazines.com\/index.php\/wp-json\/wp\/v2\/tags?post=3017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}